Do I need a SWMS?

Answer yes, no or unsure for each high risk construction work category to find out whether the job needs a safe work method statement before it starts, under your state’s rules.

Figures checked 5 November 2026. Free to use, no sign-in.

Victoria and Western Australia have their own Acts; the tool switches to them.

Is this construction work?

Building, altering, repairing, maintaining or demolishing a structure, including site preparation, excavation and fit-out.

High risk construction work (r 291, 18 categories)

Does the work involve any of these?

Unsure never counts as a yes. It flags what to confirm.

Risk of a person falling more than 2 metres
Work on a telecommunication tower
Demolition of a load-bearing part of a structure, or a part related to its physical integrity
Involves, or is likely to involve, disturbing asbestos
Structural alterations or repairs that need temporary support to prevent collapse
In or near a confined space
In or near a shaft or trench deeper than 1.5 metres, or a tunnel
Use of explosives
On or near pressurised gas distribution mains or piping
On or near chemical, fuel or refrigerant lines
On or near energised electrical installations or services
In an area that may have a contaminated or flammable atmosphere
Tilt-up or precast concrete
On, in or next to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
In an area where powered mobile plant moves
In an area with artificial extremes of temperature
In or near water or other liquid with a risk of drowning
Diving work

Your answer

Do you need a safe work method statement?

No SWMS required for this work

None of the high risk construction work categories apply. You still need to manage the risks of the work, and a written safe work procedure is often the simplest way to show it.
  • Principal contractor duties apply to a construction project costing $250,000 or more in this jurisdiction.
  • Before the work starts, give a copy of the SWMS to the principal contractor if the work is part of a construction project (r 301).

General information, not legal advice. Check the regulations for your state or territory.

How this works

A SWMS is required when construction work falls into at least one high risk construction work category. The model WHS Regulations list 18 categories in r 291, and the duty to have a SWMS before work starts is in r 299. NSW, Queensland, South Australia, Western Australia, Tasmania, the ACT, the Northern Territory and the Comcare scheme use the same numbers.

Victoria’s OHS Regulations 2017 list 19 categories in r 322 with different wording: any demolition counts, asbestos covers removal and disturbance, and tunnels are listed separately. The SWMS duty is r 327.

How answers count: one yes on construction work means a SWMS is required. Unsure never counts as a yes; it gives a “confirm before work starts” result listing what to check.

Not covered: mining, major hazard facilities and other work with its own safety case or management plan rules.

Questions

What is a SWMS?

A safe work method statement is a document that sets out the high risk construction work being done, its hazards and risks, the controls, and how those controls will be put in place and checked. It is required before high risk construction work starts.

Who has to prepare the SWMS?

The business carrying out the high risk construction work (the PCBU, or in Victoria the employer or self-employed person). On a construction project, a subcontractor usually prepares the SWMS for its own work and gives a copy to the principal contractor before starting.

Is a SWMS needed for every construction job?

No. Only work that falls into one of the high risk construction work categories needs a SWMS: 18 categories under the model regulations, 19 in Victoria. Other construction work still needs its risks managed, but no SWMS is required by law.

How long do I keep a SWMS?

Under the model regulations, until the high risk construction work is finished, or for at least 2 years after a notifiable incident connected with the work. In Victoria, for the duration of the high risk construction work.

Does a SWMS replace a risk assessment?

It records the risk controls for the high risk part of the job. You still need to manage the other risks on site, and on a construction project the principal contractor needs a WHS management plan (a health and safety coordination plan in Victoria).